Manual Task Input

Create a task with precise scheduling parameters

Basic Information
Core task details that define what needs to be done

Max 45 minutes per task (will be split if longer)

1 (Low)3 (Medium)5 (Critical)
Scheduling Constraints
Time-based constraints that control when this task can be scheduled

If set, task will be scheduled at exactly this time

Task Properties
Energy level and context help the scheduler place tasks optimally
Advanced Scheduling Settings
Fine-tune how the task can be split and scheduled